Case Study

St Mary’s School save on their heating with HeatingSave

St Mary’s School save on their heating with HeatingSave

Pages 3 Pages

St Mary’s School save on their heating with HeatingSave Welwyn St Mary’s Primary School takes children from ages 4 to 11. Built originally in 1940 as a secondary school, St Mary’s is a large school with spacious buildings and grounds. In addition to big classrooms the school has a gym, two libraries, a computer suite, a hall with stage and a music room. The school has a strong tradition for success in the Arts and Sport and have specialist teachers in Music, French and P .E. In 2009 the school was reviewing the ever increasing cost of running the school including the heating costs. 8 gas fired boilers heat the school radiators and convector heaters,and also provide hot water. Four of the boilers are made by Hanworthy and are on a common head, whilst the four other heating systems use two

Join for free to read