Case Study

The Chobani Waste Plant

The Chobani Waste Plant

SHOWCASE Chobani Plant, USA Chobani’s brand new Twin Falls, Idaho facility was given Food Engineering’s “Plant of the Year” award. The new one million square foot facility was built in an amazing 326 days. The 24" CPVC process waste system was designed to handle peak ? ows of 8,700 gpm. Initially, stainless steel and ? berglass piping for the waste drainage were under consideration. Both of the products however had minimum lead times for de

Join for free to read