Case Study
The Canopy EC at Yishun Ave 11: Cementaid products for waterproofing
Project Page: The Canopy EC at Yishun Ave 11 The Canopy EC at Yishun Ave 11 Executive Condo with a level basement, MCC being the owner and regular client of Cementaid, has called us for proposal during initial stage. After studying the drawings from MCC, Cementaid proposed 3CC System to Suspended Swimming Pool, Aquapel System to basement wall, slab and e-deck. Weldcrete Slurry to planter box, kitchen, balcony and bathroom. This is the second project that we have worked with MCC from basement to unit areas. During the Construction time, our site team has stressed hard on the QAQC for the 3CC System to the Suspended Swimming Pool. We have proposed high slump waterproofing concrete to ensure flow of concrete and proper compaction to the finishes. We are proud to say that with just 3CC Syste