Case Study
De Royale @ Jalan Rama Rama: Cementaid products for waterproofing
Project Page: De Royale @ Jalan Rama Rama De Royale @ Jalan Rama Rama Residential Development by Hoi Hup Realty. Being our regular Client, Straits Construction has awarded the project to Cementaid on the Waterproofing areas. After studied on the drawings given by Main Contractor, Cementaid proposed Aquapel to the ground slab, 1st sty slab. Everdure Caltite System to Suspended Swimming Pool and Water Retaining Structures as a Stand a lone system. After Construction, we went back to check on the supplied areas and all were in beautiful condition without any sign of seepages. Another prestige project being delivered by Cementaid. Completion Date: Jul 1, 2004 Architect: JERDE Contractor: Straits Construction Structural engineer: CP Lim Consultant Products Used: Everdure Caltite, Aquapel Addr