Case Study

The award winning Pure Gym brand required a waterproofing solution for their latest development.

The award winning Pure Gym brand required a waterproofing solution for their latest development.

Pages 1 Pages

PEACE OF MIND GU AR ANTEED CASE STUDY The Pure Gym concept is based around the passion for fitness. Pure Gym provide functional training zones for their members, open 24/7, any day or night, with state of the art fitness equipment and no need for a membership contract. Pure Gym contacted Wetrooms UK to manufacture and install level entry drainage and waterproofing systems into the male and female shower cubicles in their new gym development at Southampton. The two shower blocks needed to be fully waterproofed and appropriate drainage systems installed capable of coping with flow rates of up to 24 litres per minute, prior to the installation of six shower cubicles per block. THE CHALLENGE PURE GYM, Southampton THE SOLUTION WETROOMS UK Wetrooms UK recommended the specifi

Join for free to read