Case Study

Thameslink Borough Viaduct Bridge

Thameslink Borough Viaduct Bridge

Pages 1 Pages

www.severeld.com Thameslink Borough Viaduct Bridge Location: London Client: Network Rail Main Contractor: Skanska Engineer: Atkins Architect: Network Rail Tonnage: 1,630 Completion Date: 08/16/2011 Project Overview: The Thameslink Borough Viaduct is part of the Thameslink programme and is designed to preserve the surrounding heritage, such as the Victorian market. The bridge runs alongside the existing railway bridge and doubles the amount of ra

Join for free to read