Case Study
Borough Viaduct
Plowman Craven was commissioned directly by Network Rail to undertake extensive survey works in relation to the construction of the new viaduct running from London Bridge Station to meet with the existing viaduct at the rear of the Hop Exchange. We installed a permanent maintained survey control network which stretched from Station Approach to Redcross Way and London Bridge Street to Winchester Square. A 2D base plan of the full ex