Case Study
Temporary Boilers
Temporary Boilers Required for Large School Renovation Objective Ideal Heat Solutions was approached by a contractor who was undertaking a larger renovation and extension project at well established private school in Hertfordshire. The contractor required two temporary boilers to keep the School’s existing services operational whilst the project was being undertaken. Brief The permanent boiler house position was being relocated during the works so the client required two temporary boilers to keep two separate blocks of the schools supplied with heating and hot water for 12 months. A site meeting was conducted with the client and the school representatives to specify and establish the scope of works, which consisted of:Defining the kW capacity of the boilers required Establish logistical re