Case Study

Temporary 500kW Packaged Boiler

Temporary 500kW Packaged Boiler

Temporary 500kW Packaged Boiler Kemp House Objective Our client was the Contracts Manager of a large property development in Soho, London. The development was struggling with unreliable heating and hot water equipment. Old and inefficient boilers meant maintenance was becoming problematic, untenable, and costly. Each boiler breakdown caused significant inconvenience and had the potential to damage our client’s reputation. The risk of boiler breakdown was high, as Christmas approached a contingency plan was put in place to install a reliable temporary boiler onsite. The temporary boiler would also provide an uninterrupted supply of heat and hot water to the development during the planned installation of permanent boilers in the New Year. Briefing Time pressures dictated a quick turnaround o