Temporary 500kW Boiler Solution
Temporary 500kW Boiler Solution Kings Hotel Objective A serious flood in the hotel’s plant room had destroyed the plant, rendering it unusable. The age of the plant room and the extent of the damage meant complete reconstruction and plant replacement was required immediately. Ideal Heat’s objective was fast plant replacement to ensure minimum business downtime for the client. An immediate and comprehensive survey followed by rapid deployment and installation of an efficient temporary boiler plant room. Our Briefing Ideal heat was required to assess the site, analyse connectivity of the existing heating circuit and ascertain the most suitable location for the replacement temporary boiler. Ideal Heat Solutions had to supply a replacement plant which logistically allowed for the rebuilding of