Case Study

500kW Containerised Boiler Hire

500kW Containerised Boiler Hire

500kW Containerised Boiler Hire Large Residential Scheme, Greater London Objective Our client is the largest District Heating specialist contractor in the UK. The client required a temporary boiler to supply heat for the purpose of dramatically increasing the drying time of screed within the building. By increasing the drying time on the screed, it allowed the apartments to be completed on schedule. Brief One of the obstacles that Ideal Heat had to overcome was logistically there was nowhere outside of the site where the equipment could be positioned. Ideal Heat was briefed on the complexities of the location of where the boiler had to be positioned. Our team was tasked with conducting a detailed site survey in order to find a solution that could overcome obstacles such as the load bearing

Join for free to read