Temple Mills Eurostar Depot

Temple Mills Eurostar Depot

Pages 2 Pages

Temple Mills Eurostar Depot Earth switch installation EAST LONDON VALUE £750K JUNE 2016 – SEPTEMBER 2017 EUROSTAR OPERATED DEPOT “Removal of existing OLE and replacing with a retractable system” RAILWAY ELECTRIFICATION RAILWAY ELECTRIFICATION I n May 2016 Pod-Trak were awarded the contract to supply all labour, plant, materials, supervision and management to undertake the OLE removal works (enabling works) to remove head spans in 7no locations. The scope included the careful removal of the existing equipment and retention of the OLE wires for re- use in the new works. The scope also included the installation of new OLE equipment (Furrer & Frey), line wires and retractable motors. The works included testing and commissioning of the new infrastructure. The delivery o