Case Study

Tarraleah No. 1 Canal Coping Works

Tarraleah No. 1 Canal Coping Works

10b Industrial Drive PO Box 812 Ulverstone TAS 7315 Phone: (03) 6425 6530 Fax: (03) 6425 6112 Email: info@vec.com.au ABN 42 067 541 879 www.vec.com.au The Project 10b Industrial Drive PO Box 812 Ulverstone TAS 7315 Phone: (03) 6425 6530 Fax: (03) 6425 6112 Email: info@vec.com.au ABN 42 067 541 879 Tarraleah No. 1 Canal Coping Works Tarraleah No. 1 Canal was originally designed to convey a maximum flow of 25.5 cumecs (900 cusecs) into No. 1 Pond. However due to freeboard constraints in the canal, the design flow rate has only been achieved four times in the history of the canal, when it was first commissioned in 1938, in 1963 and 1977 after extensive clearing and in 1987 after relining. The aim of the project was to restore some capacity to the canal by

Join for free to read