Case Study
Ashton Canal Works 2013
ASHTON DREDGNG & PILING Before After A s h t o n C a n a l W o r k s 2 0 1 3 Land and Water Services Ltd were commissioned by the Canal and River Trust to carry out main line and spot dredging along the Ashton Canal from Lock 16 to the junction with the Huddersfield Narrow Canal Lock 1, which is a 7Km linear dredge length. The works also included disposal of the dredgings from Packet Boat Marina, spot dredging at Stanley Wharf on the