Taproom & Production Area Retrofit for New Craft Brewery Location
case study Taproom & Production Area Retrofit for New Craft Brewery Location Project Overview Idle Hands was retrofitting an older building to house their brewery and taproom and Black Bear was brought in to facilitate work in both customer and production spaces. Each section had a unique set of specifications to provide optimum safety and durability, as well as complement the look and feel of the space. Having completed multiple projects for local breweries and restaurants, Black Bear was the contractor of choice to provide coatings and renovations needed to meet and exceed compliance standards and strict health codes. The Process STEP 1: Removal of glues & mastics of existing floors STEP 2: Refinished existing slab and brought it up to polish STEP 3: 1/4 inch urethane cement