Case Study

System Equalising

System Equalising

DON’T LET JUST ANYONE TAKE ON YOUR DOWNHOLE CHALLENGES. DEMAND THE BEST. DEMAND TTS. WWW.THRUTUBING.COM Case Study Abrasive Perforating System Equalizes Annular Pressure Case Study No. 3203 RESULTS: A customer in Offshore Australia had 5-7/8” 26.3# drill pipe stuck in the wellbore. Gas trapped in the annulus needed to be relieved before the drill pipe could be safely cut and removed from the wellbore. The customer needed to perforate the dril

Join for free to read