DON’T LET JUST ANYONE TAKE ON YOUR DOWNHOLE CHALLENGES. DEMAND THE BEST. DEMAND TTS. WWW.THRUTUBING.COM Case Study 40 Stages Completed with 2 BHAs Case Study No. 3004 RESULTS: The customer planned to perforate 40 stages in a horizontal well with 5 1/2” 20# casing. The initial 17 stages were completed with the first BHA, at which time the tools were pulled out of the hole. Upon inspection, the packer was replaced and the remaining 23 stages