Case Study
Stukeley Street
The works involved the refurbishment of the third floor of an office block located in Holborn to create a modern shell space to be re-let by commercial property management specialists, Colliers Interna- tional. The area was stripped of all non-structural items including the ceiling, floor coverings, partition walls, furniture and M&E fixtures/fittings. Soft strip was carried out manually with hand held tools to minimise noise. Two toilet blocks on either end of the floor were re- decorated with new sanitary ware and tiling. A new raised access floor was installed and fitted with a new floor covering. The M&E package included a new FCU air conditioning system, electrical re-wire and lighting system. Other areas of the 4-storey building remained occupied throughout. Correx hoardings were er