Case Study

Staffordboro Commuter Lot Expansion | Volkert

Staffordboro Commuter Lot Expansion | Volkert

Pages 2 Pages

Staffordboro Commuter Lot Expansion | Volkert Location: Stafford County, VA Client: Virginia Department of Transportation (VDOT) Volkert looked at the long range implication of expanding the existing commuter parking lot and applied holistic design principles in developing a concept that would accommodate an additional 1000 parking spaces and reconfigure the existing parking lot for more efficient circulation and accessibility. The site (approximately 22 acres) features existing stream, wetlands, and an existing municipal water tower. Minimizing the impact to these areas was achieved by limiting the encroachment to the wetland to 25’ and providing two access points for the municipal water tower. The stormwater management design responded to environmental concerns within the area by incorp

Join for free to read