CASE STUDY SOUTHEND AIRPORT BESPOKE WALKWAY DESIGN AND BUILD OF TERMINAL WALKWAYS FOR SOUTHEND AIRPORT Following on from our initial walkway project for Southend Airport, Lockit-Safe were commissioned to design, install and project manage the full walkway system linking the terminal building. The project consisted of a 190m main walkway with four 10m branch walkways linking the walkway to the terminal building. The scale of this project and the environment we were working in, required close liaison with other contractors on site, weekend and evening work and managing the demands of installing within a live airport environment. Despite adverse weather condition, the job was completed on time – 63 tonnes of steelwork fabricated in ourfactory in 4 batches over a 6 week period 1350 steel secti