Case Study
South County Line Road Bridge Replacement
South County Line Road Bridge Replacement Client: Manitowoc County Highway Department, Wisconsin Department of Transportation Location: Town of Meeme, Wisconsin Donohue designed an 80-foot, two-span concrete flat slab bridge and 250 feet of roadway approach improvements. Alternative analysis was made to determine whether the bridge should be a single or two-span structure based on hydraulic and economic considerations. Tasks included hydrologic analysis and hydraulic modeling to verify the proposed bridge at the 100-year flood event meets backwater regulations. Donohue’s work also included structural design, agency coordination, wetland mitigation, right-of-way platting, Wisconsin DNR/U.S. Army Corps of Engineers permitting, utility coordination, and public information/involvement activi