Case Study

CTH Y - Camp Ground Creek Bridge

CTH Y - Camp Ground Creek Bridge

CTH Y - Camp Ground Creek Bridge Client: Fond du Lac County Location: Oakfield, Wisconsin This project, located in the Village of Oakfield, included removal and replacement of an existing single- span county road bridge that was constructed in 1931. The new structure is a 28-foot, single-span concrete flat slab structure. The CTH Y bridge is one of the first bridges affected by the Wisconsin Administrative Code Trans 75 complete streets legislation. As a result, a clear roadway width of 32 feet now accommodates a sidewalk on the east side of the bridge. The total project length, including beam guards, is approximately 300 feet. The design includes decorative railing and concrete form liners to improve bridge aesthetics and closely match the look of the previous structure. Heavy riprap was