Case Study
Simultaneous Cvoc Remediation In Three Treatment Areas At An Operational Manufacturing Facility
Simultaneous CVOC Remediation in Three Treatment Areas at an Operational Manufacturing Facility: EPA Region 5 Site Information: This Site is an operating manufacturing facility with vadose-zone contamination identified at three separate locations on the property. The treatment area sizes were approximately 14,187, 3,115, and 2,409 ft 2 (1,300, 290, 224 m 2 ) respectively. In Situ Thermal Desorption (ISTD) was used to remediate tetr