Case Study
In Situ Thermal Desorption (ISTD) of Three Separate Treatment Areas at a Brownfield Site
In Situ Thermal Desorption (ISTD) of Three Separate Treatment Areas at a Brownfield Site: Midler Avenue, Syracuse, NY Site Information: The Midler Crossing Site (the Site) operated as a manufacturing facility since the 1860s. As early as 1866 Pierce, Butler, & Pierce manufactured boilers and radiators in the original facility. In the early 1900s, the Prosperity Co. manufactured industrial laundry and dry cleaning equipment on the Si