Case Study

Trichloroethene (Tce) Remediation In Saprolite And Fractured Rock At An Active Manufacturing Facility

Trichloroethene (Tce) Remediation In Saprolite And Fractured Rock At An Active Manufacturing Facility

Pages 2 Pages

Site Information: At an active manufacturing facility in the South Eastern United States, trichloroethene (TCE) was released via a sump/ catch basin system associated with an aboveground TCE storage tank and a TCE reclamation unit. The Target Treatment Zone (TTZ) was approximately 33 ft (10 m) x 76 ft (23 m) (2,508 ft 2 [71 m 3 ]), extending from the ground surface to approximately 10 ft (3 m) below bedrock surface (bgs) or 85 ft (29

Join for free to read