Case Study
Siegfried - Quarry Rebuild
Siegfried Quarry Rebuild Siegfried Quarry Rebuild 69kV Double Circuits Rebuild Lehigh Valley, PA Realtime provided engineering and design services to a Pennsylvania utility for the reconstruction of an (8)-mile, 69kV double circuit line. Seven miles of 1920s vintage lattice towers were replaced with (60) new, engineering steel poles. In addition to the line design and preparation of procurement and construction documentation, Realtime assist