PROJECT Shell “Mars” CASE STUDY CLIENT Shell Deepwater OTHER PARTNERS 28.5% BP DETAILS Tension Leg Platform 3,250feet (990meters) water depth 5 deck modules PROJECT TEAM W.H. Linder & Associates (Engineering) J. Ray McDermott (Shipyard) Bay, Ltd (Piping Subcontractor) Aker Gulf Marine (Module Integration) INSTALLATION Amelia, LA USA (onshore) Ingleside, TX USA (module integration) Mississippi Canyon 807A (offshore) SYSTEMS SELECTED FOR FIBERBOND®: • Firewater, seawater, waterflood, sodium hypochlorite supply, drill water overboard • 3,200feet (975meters) of piping, up to 16” (400NB) • ABS- and USCG-type approved products • 200psig (13.8bar) design, 300psig (20.7bar) hydrotest FIBERBOND® SCOPE • Supply of materials • Shop prefabrication • Site installation including FRP welding • Installa