Case Study

Set-up Reduction Measuring Component Manufacturer

Set-up Reduction Measuring Component Manufacturer

Pages 1 Pages

Case Study #11 – Set-up Reduction Measuring Component Manufacturer PROJECT PROCESS Issue Set up times on a punch press were driving the need for large inventories in front of and after the press. There was also no standard method of changeover between crews. Scope The set up times needed to be reduced by at least 50% and a standard method developed that all crews could agree to. Approach

Join for free to read