Case Study
5S Flexible Packaging Manufacturer
Case Study #2 – 5S Flexible Packaging Manufacturer PROJECT PROCESS Issue A great deal was being lost in one of the maintenance support areas due to a lack of organization. The disorganization also led to duplication of effort between shifts. Scope Conduct a 5S event of the entire maintenance work area. Improve tables and work tools as time permits. The 5S score should be a minimum of 35 (on a scale of 0 to 50) at th