Case Study

How To Lower Set-Up Time

How To Lower Set-Up Time

Pages 2 Pages

ipl.-Ing. Andreas Schmücker, Pro- duction Director at Ross Europa GmbH, has a vision: „One work piece, one machine, one clamping, then off to assembly.” Now he is enough a realist to accept that this will not al- ways possible nor is it feasible every- where, but he will not be dissuaded from his goal. He also understands that such rigorous requirements makes the as- sistance of specialists is indispensable. Thus in the clamping technology

Join for free to read