Case Study

See the game at Metraflex Field

See the game at Metraflex Field

Pages 2 Pages

See the game at Metraflex Field FORD MAY HAVE ITS NAME ON THE OUTSIDE, BUT METRAFLEX IS ALL OVER THE INSIDE. With a “footprint” of 1,350,000 square feet and seating for 65,000 fans, Ford Field’s total cost was approximately $300 million. And we feel it should be called Metraflex Field. Phase 1 helps win Phase 2 Phase 1 encompassed the entire south wall of the stadium. It was made up of two shelled out J.L. Hudson’s warehouses, renovated to include 140 luxury suites on three levels facing the playing field, along with retail, restaurants and possibly a hotel, and the central plant for the facility. Metraflex joints were initially specified for this phase, and, as Phase 1 progressed, the project engineer was so pleased with the Metraflex joints, and the service provided by Metraflex represen

Join for free to read