Case Study
Saladin Platforms Life Extension
SALADIN PLATFORMS LIFE EXTENSION CLIENT: West Australian Petroleum Pty Ltd (WAPET) The Saladin platforms were installed in late 1989 and initially designed for a 10 year operating life, with decommissioning anticipated in 1999. An increase in recoverable hydrocarbons from the Saladin fields required operating life to extend for an additional 20 years beyond the original design life. J P KENNY/ WOOD GROUP INTEGRITY MA