Case Study

Safe, Reliable, Cost-Effective Solutions for the Electrical Power Industry

Safe, Reliable, Cost-Effective Solutions for the Electrical Power Industry

Solution Profile Substation ACB Retrofill Project Client Type Electric Utility Challenge/Issue CE Power Solutions to design and install 4 feeders and 1 main in a very critical substation located within grid feeding an area hospital. Equipment Involved Medium voltage station service, bus tie, main, and feeder circuit breakers replaced with vacuum circuit breakers 15KV, 750MVA, 1200A, 125VDC. Solution Design, build and instal

Join for free to read