CE Power to design and install 37 retrofill applications in a 4 week outage

CE Power to design and install 37 retrofill applications in a 4 week outage

Solution Profile Switchgear Retrofill Upgrade Client Type Electric Utility Challenge/Issue CE Power to design and install 37 retrofill applications in a 4 week outage. Equipment Involved Vertical lift air magnetic circuit breakers replaced with draw – out vacuum circuit breakers, 4160V switchgear Solution Design, build, and install a retrofill application to replace existing switchgear with draw – out vacuum circuit