Case Study
Design new cells and tie breaker to match existing lineup to power large motor for water pump
Solution Profile Switchgear Add-On Client Type Municipal Facility —Water/Wastewater Challenge/Issue Design new cells and tie breaker to match existing lineup to power large motor for wa- ter pump Equipment Involved Medium voltage circuit breakers and associ- ated components Solution Design, build and install new units Scope/Deliverables Provide design engineering for replacement breakers to fit into existing conditions with limit