Case Study

Design new cells and tie breaker to match existing lineup to power large motor for water pump

Design new cells and tie breaker to match existing lineup to power large motor for water pump

Solution Profile Switchgear Add-On Client Type Municipal Facility —Water/Wastewater Challenge/Issue Design new cells and tie breaker to match existing lineup to power large motor for wa- ter pump Equipment Involved Medium voltage circuit breakers and associ- ated components Solution Design, build and install new units Scope/Deliverables Provide design engineering for replacement breakers to fit into existing conditions with limit

Join for free to read