Case Study
Robert V. Trout, Carter Lake - Colorado, USA
Gilkes was chosen as the preferred supplier for the mechanical and electrical equipment for what was then referred to as the ‘Carter Lake Hydroelectric Project’ in 2011. Gilkes scope of supply included Turbine Shut-Off Valves, Francis Turbines, Hydraulic Power Units, Generators, Control and Protection System, Station Service Transformer and Genera- tor Switchgear. A Gilkes team of engineers was assigned to support Northern Colorado Water