Case Study

Coniston

Coniston

Pages 3 Pages

experience of a lifetime // innovation for tomorrow Gilbert Gilkes & Gordon Ltd., Canal head North, Kendal, Cumbria LA9 7BZ t 01539 720028 • f 01539 732110 hydro@gilkes.com The Return of Hydropower CONISTON CASE STUDYThe Coniston Hydro Scheme is on Church Beck, draining the Furness Fells above Coniston, in the Lake District National Park. The site was first developed in 1932 when a single turbine was installed, with a second turbine added in

Join for free to read