Case Study

Riser and J-tube FEED

Riser and J-tube FEED

Pages 2 Pages

The problem Our client was undertaking a project to increase the production from one of its existing platforms in the North Sea by installing an additional platform and expanding the existing re-injection facilities. We were asked to complete the front end engineering design (FEED) for eight 6-inch rigid risers and for two j-tubes to allow the installation of control umbilicals. Jee was to work with our client’s jacket design team to develop a solution that provided an optimised riser design that minimised the requirements on the jacket structure. The solution We reviewed the initial concept, identied potential cost savings in the design and undertook the engineering work required to ensure that accurate cost estimates could be produced to enable project sanction. In-house MathCAD calcula