Case Study
Dynamic riser concept design
The scope Our client was engaged on the eld development of a prospect within the Norwegian Continental Shelf. The concepts assessed included a semi-submersible oating production unit and a spread-moored FPSO. For each facility tie-back concept, the potential riser con gurations and performance were to be assessed and optimised. The solution The semi-submersible concept was reviewed in phase 1 of the work, considering mid-water arch lazy-S and distributed buoyancy lazy- wave con gurations. It was shown that the mid-water arch con guration gave acceptable loads and clashing results and was superior from a eld layout perspective for the con ned spacing allowed around the existing semi-sub. The FPSO concept was reviewed in phase 2 of the work, considering compliant wave riser con gurations,