T he overall scope of the project was to replace 6 existing pumps with 6 no. 630kw Variable speed pumps- selected to achieve optimum performance and energy efficiency. Pod-Trak were engaged by SSE to replace 2 10/20kv – 3.3kv transformers and 2 3.3kv – 400v transformers. The overall clients are EPS and Irish Water – with our scope to upgrade all MV and LV requirements. This included the installation of new MV NX Air Siemens Switchgear, all the associated Controls and Instrumentation and upgrade of all the associated LV systems including full SCADA control systems for the VSD modules and all the associated monitoring and sensor systems for gas monitoring and pump related equipment. The works were undertaken in a staged managed process to ensure continuous operation of the li