Case Study
Redesigning a Train Loading System
Results The approaches taken to execute and optimize the design have shown positive results, meeting client’s requests and capabilities: ? The designed train loading system satisfied all client requirements, including flow control and collapsible systems ? Reduced manufacturing time by over 20%, costs by more than 10%; thereby enabling the client to ship the product on a tight schedule with higher gross profits Redesigning a Train Loading System Business challenge The client gets customized orders from its customers to build machines capable of loading trains in motion. To do so, they needed plans and an equally capable team who understood and executed complex build requirements. Challenges for these systems included: ? A need for the provided team to study and underst