Case Study

Process Improvement Reduced Hospital’s Bed Turnaround Time 75%

Process Improvement Reduced Hospital’s Bed Turnaround Time 75%

Pages 3 Pages

440 E. Congress, Suite 400 | Detroit, Michigan 48226 | Tel: (313) 965-0350 | Fax: (313) 965-7545 | www.iriconsultants.com CASE STUDY: Process Improvement Reduced Hospital’s Bed Turnaround Time 75% The Client A multiple-Magnet, large metropolitan hospital. The Challenge The average bed turnaround time (the elapsed time between one patient being discharged from a room and another admitted to the same room) was more than si

Join for free to read