Case Study

Preventing Non-conforming Material from Leaving the Factory

Preventing Non-conforming Material from Leaving the Factory

Pages 9 Pages

CASE STUDY | General Manufacturing Elevating Quality to the Top FloorPreventing Non-conforming Material from Leaving the Factory Out-of-spec elevator wall panels were causing job site construction delays that ranged from 2 to 7 days— angering customers, costing money, and wasting installation crew time. InfinityQS enabled this international elevator company to quickly identify where panel processes were flawed—empowering them to take immediate corrective action. GAINING STRATEGIC INSIGHT REDUCING ELEVATOR PANEL PRODUCTION TIME REDUCING ANALYSIS FROM WEEKS TO MINUTES Reduced Takt time to just time savings per run per run Captured by InfinityQS software 2-3 minutes 30 data points real-time quality data Before InfinityQS, this company manually collected InfinityQS provided quality data .