Case Study

Portugal Cove, St. Philip's, Newfoundland; ISAMTM - Integrated Surge Anoxic Mix

Portugal Cove, St. Philip's, Newfoundland; ISAMTM - Integrated Surge Anoxic Mix

Portugal Cove, St. Philip's, Newfoundland; ISAMTM - Integrated Surge Anoxic Mix Client: Portugal Cove, St. Philip's, Newfoundland Solution: ISAMTM Integrated Surge Anoxic Mix Background: The Town of Portugal Cove-St. Philip’s, Newfoundland Labrador --- The public works superintendent and his consulting engineer here report successful operation of a special activated sludge wastewater treatment plant (WWTP) for St. Philip’s since the end of 2003, with a similar and larger plant scheduled to start up for Portugal Cove later this year. The currently operating plant, with design average flow of 7.7 liters/second. and peak flow of 28.5 liters/second, has consistently met effluent standards for biochemical oxygen demand (BOD), total suspended solids (TSS), total nitrogen (TKN), phosphorus (P), a

Join for free to read