Case Study

NORWOOD, ONTARIO ISAMTM (Integrated Surge Anoxic Mix) INCREASES PLANT CAPACITY WHILE REDUCING OPERATIONAL COST AND IMPROVING EFFLUENT QUALITY

NORWOOD, ONTARIO ISAMTM (Integrated Surge Anoxic Mix) INCREASES PLANT CAPACITY WHILE REDUCING OPERATIONAL COST AND IMPROVING EFFLUENT QUALITY

NORWOOD, ONTARIO ISAMTM (Integrated Surge Anoxic Mix) INCREASES PLANT CAPACITY WHILE REDUCING OPERATIONAL COST AND IMPROVING EFFLUENT QUALITY Client: Norwood, Ontario Solution: BNR Background: The Township of Asphodel-Norwood (Township) is located in central-eastern Ontario in Peterborough County. Population growth in the community meant that the treatment capacity of the Norwood Water Pollution Control Plant (WPCP) needed to be increased from 0.19 MGD to 0.32 MGD average day flow (ADF). The original WPCP included screening, grit separation, secondary treatment with a carousel-type extended aeration (EA) plant, and chlorine disinfection. Due to the necessary capacity increase, the effluent for the upgraded plant was required to meet a more stringent quality than the existing facility. In

Join for free to read