Case Study
Pond Reconstruction to Mitigate Flooding and Erosion
Pond Reconstruction to Mitigate Flooding and Erosion Client: The City of Rockville Location: Rockville, MD In conjunction with our design partners, Charles P. Johnson & Associates and Slater & Associates, Hazen and Sawyer prepared pond retro t plans and oversaw construction in a local park in Rockville, Maryland. This restoration created much needed o ine ood control and reduced downstream channel erosion rates. Project Outcomes and Benefits Provides ood control, water quality improvement and stream restoration to protect a 2,100 foot long downstream receiving water, the College Gardens Tributary. Used a 60 mil liner, ow splitting, extended detention for the one- inch storm and channel protection control over twenty-four hours for the one-year event. A natural channel design approach ut