Case Study

Erosion Control

Erosion Control

Case Study Two dwellings situated below the Blackmoss Reservoirs in Barley had been identified as at risk from flooding should either (or both) the reservoirs burst their banks after heavy rainfall. The scope of the project was to construct a new emergency spillway below the lower reservoir so that flood flows could safely pass by the dam and be directed away from the properties and into an existing waterway, ultimately draining away to

Join for free to read