Case Study

Erosion & Sediment Control: Newtonville, ON-SWM Pond

Erosion & Sediment Control: Newtonville, ON-SWM Pond

issue number six Newtonville, ON – SWM Pond Erosion & Sediment Control Case Study INSTALLATION DATE Winter 2011 PROJECT ENGINEERS The Sernas Group SITE SERVICING CONTRACTOR Behan Construction Ltd. CHALLENGE Hard armour erosion protection was required to line the spillway of a new stormwater management pond. SOLUTION FLEXICRETE®, an articulated concrete block solution, was selected and installed for this project. PROJECT OVER