A Marmon Wire & Cable / Berkshire Hathaway Company Project Podick Substation Client NUSCO Location Amherst, MA Cable Design 115 kV, 1000 kcmil CU Length 675 Circuit feet Subcontractor(s) Central Connecticut Cable Scope Pulled cable through owner supplied duct bank, assemble 6 G&W PAT 140 terminals, install grounding link boxes and provided final acceptance testing. Kerite Cable Services Project Profile (203) 888-2591 • 1-800-777-7483