Case Study
Eastport Substation
Eastport Substation Eastport Substation, Rochester, NH 115kV Substation Expansion Realtime engineered the expansion of the Eastport Substation, expanding bus and adding new line and breaker positions. Project Scope: Phase I (2) bay, breaker and a half configuration, with (3) line positions ultimate configuration (4) bay, breaker and a half configuration, with (8) line positions Realtimes Design Included: (2) 115kV, 2000A SF6 GCBs, 11 CCVTs,